Custom Prefab Open Room with Integrated Security Cabins | Hamriyah Free Zone, Sharjah

High-quality custom prefab structure featuring a two-room open layout with integrated security cabin design, delivered and installed at Hamriyah Free Zone, Sharjah. Built for durability, thermal comfort, and operational efficiency in industrial and commercial environments.

Custom prefab Open Room Security
Elevated portable cabin structure installed on steel frame platform

About Custom Prefab Open Room with Security Cabins – Hamriyah Free Zone, Sharjah

This project involved the design, fabrication, and installation of a custom prefab two open-room structure integrated with security cabin functionality for a facility located in Hamriyah Free Zone, Sharjah.

The client required a durable and climate-controlled modular building suitable for on-site staff use and security operations. The solution was engineered using a high-strength steel chassis frame and insulated prefab panels to ensure long-term performance in UAE weather conditions.

The structure was delivered as a fully finished, ready-to-use modular unit with electrical systems, AC installation, insulation, and interior finishing completed on-site.

Inside the Custom Prefab Open Room with Integrated Security Cabins

Project Description

The installed unit is a Custom Prefab Two Open Room structure (6m L x 2.4m W x 2.6m H) designed to serve dual operational purposes, including workspace and security monitoring support.

The building was engineered with a reinforced steel chassis frame, constructed using tubular steel sections with full perimeter beams, central runners, and cross members. All steel components were wire-brushed and coated with protective primer to ensure corrosion resistance and durability.

Structure & Build Specification

Base Frame:

  • Heavy-duty steel chassis frame
  • Tubular steel structure with perimeter beams
  • Central runner and cross members
  • Anti-corrosion primer coating

Insulation & Wall System

  • External Finish: ACP panels
  • Internal Finish: ACP panels
  • Wall Insulation: 50mm Rockwool insulation (30kg/m³ density)
  • High thermal and acoustic performance suitable for industrial environments

Roof & Ceiling System

  • 50mm GI/Aluminium sandwich panel with PU insulation
  • False ceiling: 12mm gypsum board with white paint finish
  • Designed for heat resistance and interior comfort

Electrical Installation

  • Fluorescent LED lighting inside each room
  • External lighting system for security visibility
  • Fully concealed wiring system
  • 32A power inlet for heavy-duty load usage
  • 2 × 1.5 ton split AC units (Super General or equivalent)

Flooring System

  • Vinyl flooring installed over 18mm cement board
  • Durable, easy to maintain, and suitable for heavy foot traffic

Room Configuration

First Room (Main Entry / Office-Security Zone)

  • 1 Aluminium entrance door with glass panel
  • 2 Aluminium powder-coated windows with glass
  • Designed for monitoring, supervision, or administrative use

Second Room (Support / Security Cabin)

  • 1 Aluminium powder-coated door
  • 1 Aluminium powder-coated window
  • Suitable for security personnel or operational control use

Project Highlights

  • Location: Hamriyah Free Zone, Sharjah
  • Project Type: Custom Prefab Security Integrated Structure
  • Structure Size: 6m × 2.4m × 2.6m
  • Configuration: Two Open Rooms with Security Functionality
  • Insulation: Rockwool + ACP panel system
  • HVAC: 2 × Split AC units installed
  • Electrical System: Fully concealed wiring with industrial power input
  • Flooring: Vinyl over cement board base
  • Completion Date: 27 August 2025

Execution & Outcome

The project was completed successfully with full on-site installation and system integration. The structure was delivered as a fully functional modular unit, ready for immediate operational use.

Key outcomes included:

  • Strong thermal insulation suitable for UAE climate conditions
  • Comfortable interior environment with dual AC system
  • Secure and durable prefab design for industrial site usage
  • Efficient space utilization for both operational and security needs
  • High-quality finishing with ACP panels and gypsum ceiling system

The client received a fully operational prefab facility that supports both administrative and security-related functions, ensuring smooth on-site operations within Hamriyah Free Zone.